Board over Grating

Bookmark and Share

In May 2017 two sets of broken aisle gratings were repaired and extra metal supports were added beneath each of the larger gratings in the church.  

While the supports were being fitted it was noticed that the mortar between the bricks near the lectern was in very poor condition. The blacksmith secured the bricks immediately next to the new supports but could not repair all the loose bricks. Also the flagstone, sitting on adjoining bricks in front of the lectern was rocking, so the board was left over it as a precaution.

Quotations for the repair work have been obtained.

For more information contact: Clem   Email   020 8697 0127